Project Details

Client               : TMO Opium Alkalodis Plant

Contract          : Turnkey Process Design, Supply and Installation Projects


Opium Alkaloids Plant New Pilot Facility Project, 2007

Project Details

Detailed engineering and construction of extension building
100.000 Class / ISO Class 8 cleanrooms
Stainless steel platforms
Exproof electrical and lighting systems
Access control system
Epoxy coated floors

Opium Alkaloids Plant 6.9 m3 Reactor Project, 2008

Project Details

Supply and installation of the 6,9 m3 Reaction tank
Process made of 316 Ti
Piping and instrumentation
Exproof electrical systems
Pneumatic valve controls
Start - up and commissioning

Opium Alkaloids Plant Centrifuges Supply and Installation Project, 2008

Proje Detayları

2 x 300 l centrifuges - GMP compliant design
Process design and installation
Nitrogen inertization system
316 Ti piping
Exproof control panels and connections
Commissioning, validation and documentation of the centrifuges

Opium Alkaloids Plant Process Design and Installation, 2007

Project Details

Turnkey design, detailed engineering, supply and installation of process
2 x 2500 l glass lined reactors
150 l centrifuge
Nitrogen inertization system
500 l liquor tank
3 m3 solvent tank
Cartridge filters, pumps and condensers
Hydraulic crane
Construction of SS platforms
316 Ti piping
Exproof control panels and connections
Commissioning, validation and documentation

Opium Alkaloids Plant Extraction Facility HVAC System, 2009

Proje Detayları

System design, supply and installation
High solvent vapour and temperature control
Exproof electrical systems
BMS (Building Management System)
Start-up, commissioning and HVAC validation

Opium Alkaloids Plant Bottom Discharge Centrifuge System, 2012

Project Details

Design, supply and installation of process
200 l Bottom discharge centrifuge– GMP compliant system
Nitrogen inertization system
Hydraulic scraper
Construction of SS platforms
Exproof control panels and connections
Commissioning, validation and documentation of system

Opium Alkaloids Plant Product Drying Process 2012

Project Details

Scope of Work:
Turnkey design, supply and installation of process
160 kg 12 Bar resistant Fluid Bed Dryer – GMP compliant design
Pneumatic transfer system
AHU and exhaust units
Civil works and steel construction
Exproof control panels and connections
Commissioning, validation and documentation of system

Opium Alkaloids Plant Pharmaceutical Milling Process, 2016

Project Details

Process design, supply and installation
Exproof Pharmaceutical Milling System
N2 Generation and recirculation system
Process automation
Technical utilities
System qualifications, training of owner’s personnel and tech. documentation
Startup, commissioning and test runs